Second solar tower at 2GW Bole-Jinghe integrated energy park connects to Xinjiang Grid

[Ed: This news from CSTA concerns the 100MW tower CSP at the second of two adjacent 1 GW sites (each with 900MW PV), so now they are actually integrated as a 2GW site with a total of 1.8GW PV, with two separate 100MW tower CSP plants. This is developed by the subsidiary of CNNC (China …