[Ed: There now appears to be two separate 100 MW solar towers, each with 8 hrs of storage, independently developed by two separate developers and with different technology providers, spaced 60 km apart at the same new energy site. So instead of two 1 GW sites (with 900MW PV), this is actually one 2GW site …
Continue reading “Second tower at 2GW Jinghe energy park connects to Xinjiang Grid”

