Skip to content
Focal Line Solar Inc.

Focal Line Solar Inc.

Dedicated to Continuous Innovation

  • Home
  • Applications
  • Technology
  • About Us
  • Contacts

Day: August 24, 2021

Posted on August 24, 2021

View the 2021 SolarPACES Conference Program Now

The 27th SolarPACES conference is coming up on September 27 – October 01! We are excited to inform you that the program of this key event on Solar Power & Chemical Energy Systems is now available online. You will get excellent insight into the newest research and field results in more than 140 talks and 110 poster …

Continue reading “View the 2021 SolarPACES Conference Program Now”

Posted on August 24, 2021

ACWA Power Takes Next Steps for Giant Solar Park

The company announced the inauguration of the 300-MW first stage of the 900-MW Shuaa Energy 3 PSC, which is the fifth phase of the Mohammed bin Rashid Al Maktoum Solar Park in Dubai. Once fully operational, the park will be the largest single-site solar park in the world based on an independent power producer model, …

Continue reading “ACWA Power Takes Next Steps for Giant Solar Park”

Calendar

August 2021
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
3031  
« Jul   Sep »

Archives

RSS Solar Daily

  • Astronauts returning from six-month International Space Station stays land measurably taller, sometimes by up to 5 centimetres, because without gravity compressing their vertebrae the intervertebral discs slowly rehydrate and expand, and the effect reverses within a few painful weeks back on Earth September 2, 2026
    After six months on the International Space Station, astronauts return up to 5 centimetres taller because microgravity lets their intervertebral discs rehydrate and expand — and the effect reverses painfully within weeks of landing. The post Astronauts returning from six-month International Space Station stays land measurably taller, sometimes by up to 5 centimetres, because without […]
  • On 24 August 2006, the International Astronomical Union voted in Prague to reclassify Pluto as a dwarf planet, and the Smithsonian’s Air and Space Museum staff simply walked to the Exploring the Planets gallery entrance and placed a red ‘no’ symbol over the Pluto sign September 1, 2026
    On 24 August 2006, astronomers in Prague voted to reclassify Pluto as a dwarf planet — and within hours, Smithsonian staff walked to the Exploring the Planets gallery and stuck a red prohibition sticker over the Pluto sign, the fastest museum update in the building's history. The post On 24 August 2006, the International Astronomical […]
  • A cumulus cloud drifting across a summer sky can weigh roughly 500 tonnes, about the mass of 100 elephants, yet it floats because the warm air holding those water droplets aloft is still less dense than the cooler air pressing up beneath it August 28, 2026
    A typical fair-weather cumulus cloud holds around 500 tonnes of water, roughly the mass of 100 elephants. It floats because the warm, humid air suspending the droplets is fractionally less dense than the cooler air pressing up beneath it. The post A cumulus cloud drifting across a summer sky can weigh roughly 500 tonnes, about […]

RSS Solar Industry

RSS Solar Power World

  • Glint Solar unveils project site viability software September 2, 2026
    Glint Solar, an AI-powered software platform for utility-scale solar and energy storage development, has a new tool that allows solar and storage developers to search an entire U.S. state for viable project sites in minutes. The Land Screening tool combines grid, permitting, environmental and technical constraints at parcel-level resolution, helping developers identify lower-risk opportunities earlier in… […]
  • PVFARM officially launches RE PILOT solar + storage project tools September 2, 2026
    PVFARM has launched the commercial version of its platform for utility-scale solar + energy storage project optimization, RE PILOT. Together with PVFARM and RE STACK, RE PILOT forms an expanding suite of tools for utility-scale renewable energy design that enable teams to explore a wide range of project configurations before progressing into detailed engineering. RE… […]
  • 347-MW solar project breaks ground near Houston September 2, 2026
    Construction has started on the 347-MWDC SunRoper Solar project in Wharton County, Texas. SunRoper is expected to begin operations in December 2027 and will export power on the ERCOT grid. “SunRoper demonstrates how strategic partnerships can help meet Texas’ growing demand for electricity through investments in critical energy infrastructure,” said Sabah Bayatli, President, OCI Energy,… […]

Contacts

Offices:

in US and Ukraine

Phones:

+1-805-624-6697

+380 95 382 14 92

Hours
Monday—Friday: 10:00AM–6:00PM

  • Facebook
  • linkedIn
  • Email
Privacy Policy Proudly powered by WordPress