Xavier Lara on How Spain’s Q4 Auction Can Achieve the 5 GW of Concentrated Solar Power it Wants

Spain’s National Energy and Climate Plan, the PNIEC (Plan Nacional de Industria, Energia y Clima) includes a desired 5 GW of Concentrated Solar Power added to its existing 2.3 GW, with 2.5 GW in a first tranche from 2021 to 2025 and a second 2.5 GW from 2026 to 2027. But what are the policies …

Xavier Lara on How Spain’s Q4 Auction Can Achieve the 5 GW of CSP it Wants

Ultimate Trough CSP from schlaich bergermann partner sonne GmbH (SBPS) in DubaiIMAGE@ SBPS Spain’s National Energy and Climate Plan, the PNIEC (Plan Nacional de Industria, Energia y Clima) includes a desired 5 GW of CSP added to its existing 2.3 GW, with 2.5 GW in a first tranche from 2021 to 2025 and a second 2.5 GW …