The total annual cumulative actual power generation of the SUPCON SOLAR Delingha 50MW Molten Salt Tower CSP Plant in 2022 was 146.4 GWh, i.e. 100.26% of the designed annual power generation (146GWh), completing yearly target. Figure 1: 2022 annual power generation of the plant The plant has been operating in good conditions. As shown in the monthly power generation …